Survey

Survey
Spider Hole November 2021

Saturday 22/11/2014

Clare, Kevin, Jude, Pete & Myself. Massive clearing session from the very bottom of the dig, probably increasing the depth by another 2 feet. Three more holes drilled in the floor and in the South and a two det charge bang done with me overseeing Kevin laying it. The charge was fired from the bottom of the Four Tonne Shaft and we were chased out by the fumes. Adrian.

Monday 17/11/2014

Tom, Jude, Pete & Myself. With myself feeling a bit crap I left Pete to do the drilling and loading of the holes. Satisfactory bang and will have to wait and see what it’s done. Adrian.

Monday 10th November 2014

John Cooper, Pete Hann, Simon Richards (Nik Nak), Adrian Vanderplank and Jude Vanderplank. Jude filled the bucket and the rest of us hauled up the spoil in the main shaft. 2 hours. John.

NikNak, John Cooper, Jude, Pete & Myself. An evening session to try and reduce the amount of clatch building up at the bottom of the main shaft. The usual 40 buckets & one for luck done. Pete raised the height of the wall to hold the clatch. Adrian.