Survey

Survey
Spider Hole November 2021

Monday 24th September 2018

John Cooper, Pete Hellier and Adrian Vanderplank. Reduced team so took a bag of sand in and used it in a mix of cement at the very bottom. Adrian started capping along the bottom but wonders if cord might be better. Rather drippy after the rainy weekend! Adrian thinks someone had been down as the bucket was attached to the rope in Four-Tonne Shaft and the heap was smaller than he left it - very odd. 2½ hours.

Monday 17th September 2018

John Cooper, Pete Hellier, Wayne Starsmore, Adrian Vanderplank, Jude Vanderplank and Barry Weaver. Adrian and Pete first had a look at the very bottom, most impressed. With Adrian filling, Barry on the ledge, Wayne and Pete hauling, Jude in The Pit and John in the eyrie 42 loads were hauled up Four-Tonne shaft. 2¼ hours.

Monday 10th September 2018

John Cooper, Wayne Starsmore and Barry Weaver. With Wayne loading, John hauling and Barry stacking another 28 loads were hauled up the bottom shaft leaving it clear. Wayne said end drafting nicely. 1½ hours.