Survey

Survey
Spider Hole November 2021

Monday 28th November 2016

 

John Cooper, Tony Seddon and Adrian Vanderplank. Bottom banged, 3 x 8mm x 500mm holes, and the deviation pulley removed for renewal. 1¾ hours.

John Cooper, Tony Seddon & Myself. Last Monday had been the exceptionally wet one, and with there having been floods down the Gorge and a long day out on the fire engine we had abandoned last week. Tonight Tony & Myself to the bottom. Three shot holes drilled and 1.5 metres of 40gm used. JC removed the middle deviation pulley which he has sent to Nigel for a replacement, hopefully. Adrian.

Monday 14th November 2016

James Collings, John Cooper, Mike Kousiounis, Adrian Vanderplank and Jude Vanderplank. With Adrian filling at the bottom of Four-Tonne shaft and Mike stacking at the top 42 fairly light loads were hauled up. Adrian thinks about another half session required to clear the bottom of Four-Tonne Shaft. 2 hours. John.

John Cooper, NikNak, James Collings, Jude & Myself. Still clearing the bottom of 4 tonne shaft. 42 buckets moved and both pulleys removed for cleaning. Adrian.