Spider Hole November 2021

Monday 27th March 2017

John Cooper, Simon Richards (Nik-Nak), Adrian Vanderplank and Jude Vanderplank. Adrian and Jude built walls at top of Four Tonne Shaft whilst Nik Nak drilled 2 x 1m holes for 40gm cord at bottom. Also started 20mm hole for rebar to support roof of new tunnel. Adrian then charged holes and fired. 2 hours. John.

John Cooper, NikNak, Jude & Myself. A productive digging session tonight with Jude & Myself adding height to the top wall of the shaft from main chamber and a bit to the intermediary wall at the top of the old stacking space. NikNak & John drilled two 10mm holes x 1 metre deep and the bottom and 1 x 20mm hole which will be used to place a piece of rebar in as a safety feature. I then went down loaded the holes with 40gm cord, connected it up and NikNak fired it from the ledge, which the wire still reaches just!!! A good thump was heard, but we weren’t chased out by the fumes, not sure if that’s a good or a bad thing. Adrian.

Monday 20th March 2017

John Cooper, Vern Freeman, Simon Richards (Nik-Nak), Adrian Vanderplank and Jude Vanderplank. Moved 50 loads of spoil up Four Tonne Shaft. Very drippy again. All cleared now! 1¾ hours. John.

John Cooper, NikNak, Vern, Jude & Myself. At last the bottom of 4 ton shaft is cleared. 50 buckets. Total since last bang 142! Adrian.