Spider Hole November 2021

Monday 25th November 2019


Tom Chapman, John Cooper and Wayne Starsmore. Took in 2 bags of sand. John and Wayne took 1 mix to the bottom to continue building up the left hand wall. After Tom had a look at the dig face he inserted a couple of hangers at the top of the bottom shaft for those that wished to SRT it. 1½ hours.

Monday 18th November 2019


John Cooper, Wayne Starsmore and Adrian Vanderplank. Took in 2 bags of sand. One mix of cement taken down Four-Tonne Shaft. Half used by Adrian supporting the protruding boulder and half used by John supporting the left hand wall. Meanwhile Wayne continued building the Spiral Staircase. A flow test proved negative today. Draught testing inconclusive too. 2¼ hours.

Monday 11th November 2019


John Cooper, Pete Hellier, Wayne Starsmore and Adrian Vanderplank. Took in 2 bags of sand. One mix of cement taken down Four-Tonne Shaft. Half used at the top of the bottom shaft and the other half used in the bottom tunnel. Meanwhile Wayne built up the Spiral Staircase. Interesting flow test between the pee-hole at the mixing spot and the bottom Grotto. Need to re-do and time. 2 hours.