Spider Hole November 2021

Tuesday 28th July 2020

John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. Took in 1 bag of sand and a part used bag of cement. One mix taken to bottom. First clearing from the bottom, then capping, then cementing walls. Going down nicely with a nice draught coming out. 3 hours.

Saturday 25th July 2020

John Cooper, Adrian Vanderplank and Jude Vanderplank. Took in 2 bags of sand and capping kit. No drips in mixing chamber whist getting 1 mix ready to go to the bottom. Continued digging downwards and also backwards until ran out of battery. The small chamber back under is a dead end, the draught is coming from below. Very drippy in mixing chamber on way out! 3½ hours.

Tuesday 21st July 2020

John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. Took in 2 bags of sand and a new 10m ladder for the lower part of Nut Pitch (brought out the old one which is 10.4m). Took 2 mixes to the bottom. A small amount used at the bottom of Dedicated Stupidity. Lots of clatch and rocks lifted from the dig floor before a cementing session to build up the retaining walls. Probably need to cap a couple of boulders in the floor next time. 3½ hours.