Saturday 03/01/2015

Pete, Nigel & Myself. Cave very damp. All to the bottom. Pete drilled 3 holes, 2 x 0.5m holes and a 1m long hole. I laid the charge with 40gm cord and we retired to the ledge to fire it. The charge wasn’t as loud as I thought it might be. As we were about to prussik up the fumes had caught up with us, going straight out. Adrian.

Monday 29th December 2014

John Cooper, Pete Hann, Simon Richards (Nik Nak), Adrian Vanderplank and Jude Vanderplank. Adrian filled the bucket and the rest of us hauled up the spoil in the main shaft. 41 buckets moved. 2 hours. John.

John Cooper, NikNak, Pete H, Jude & Myself. With the Thursday team being intermittent to say the least, we put in a big hauling session clearing mainly clatch, but there was still a lot left to clear. Adrian.

Saturday 27/12/2014

Pete Hann, NikNak & Myself. Another good digging session at the bottom. We seem to be finally through the layer of small stones mud & clatch with more larger rocks appearing in the North and in the middle and the South is still heavily calcited in rocks. A damp session but rewarding. Adrian.