Monday 4th November 2019


John Cooper, Pete Hellier, Wayne Starsmore and Adrian Vanderplank. Took in 2 bags of sand. Cleared the bottom shaft in just 24 loads. It was rather wet and drippy tonight! 1½ hours.

Monday 28th October 2019


John Cooper, Rob Harper, Wayne Starsmore and Adrian Vanderplank. Took in a bag of cement. The spoil in Spider Hole is amazingly fecund. From the 42 loads we had left at the bottom of Four-Tonne Shaft last week we managed to get 56 loads which were left in The Pit. 2 hours.

Monday 21st October 2019


John Cooper, Pete Hellier, Mike Kousiounis, Wayne Starsmore and Adrian Vanderplank. Took in 2 bags of sand then worked the bottom shaft. With Wayne at the face, Pete loading, Mike hauling, John transferring and Adrian stacking at the bottom of Four-Tonne Shaft 42 loads were hauled up. Not quite so drippy tonight. 2¼ hours.