Saturday 24/01/2015

Nigel, Pete & Myself. Two buckets of cement, with some walling done on the North side. A small amount of clatch hauled out but no rock due to the wall being built on top, will have to wait until Monday to haul out some more rock. Nigel to the bottom! Bottom shaft measured at 8.3m. Adrian.