Nigel, Pete & Myself. Two buckets of
cement, with some walling done on the North side. A small amount of clatch
hauled out but no rock due to the wall being built on top, will have to wait
until Monday to haul out some more rock. Nigel to the bottom! Bottom shaft
measured at 8.3m. Adrian.