Pete
Hann & Myself. With the bottom
of the dig having looked heavily calcited we decided that it would benefit from
a “shake up”, 2.5 metres of 100gm used but drilling the holes was quite
demanding with us only able to achieve 400mm holes. Fired and retired. Adrian.