Monday 27th June 2016

James Collings, John Cooper, and Adrian Vanderplank. Not quite as wet tonight as it was last week but still drippy. Banged 3 of the holes that Pete had drilled (and 1 that Adrian drilled tonight). Whilst Adrian was setting up john hammered a bit off the step at the bottom of Four-Tonne Shaft. 1¼ hours. John.

John Cooper, James Collings & Myself. Last week in addition to Pete cementing Pete also drilled some holes in the floor, so 3 holes located & loaded with 40gm cord (2 metres). Retired & fired. JC managed to break up the “step” at the bottom of 4 tonne shaft so will try to clear this on Monday. Adrian.

Monday 20th June 2016

James Collings, John Cooper, Pete Hann, Simon Richards (Nik-Nak), Adrian Vanderplank and Jude Vanderplank. Sent a mortar mix and drill down for Pete to use whilst the rest of us cleared the spoil up Four-Tonne Shaft. Only 36 loads! Very wet tonight! 2 Hours. John.

John Cooper, Pete Hann, James Collings, NikNak, Jude & Myself. With Pete (Guest Appearance) cementing at the bottom the rest of us hauled spoil out of 4 tonne shaft. 36 buckets of spoil. Adrian.