Survey

Survey
Spider Hole November 2021

Monday 27th June 2016

James Collings, John Cooper, and Adrian Vanderplank. Not quite as wet tonight as it was last week but still drippy. Banged 3 of the holes that Pete had drilled (and 1 that Adrian drilled tonight). Whilst Adrian was setting up john hammered a bit off the step at the bottom of Four-Tonne Shaft. 1¼ hours. John.

John Cooper, James Collings & Myself. Last week in addition to Pete cementing Pete also drilled some holes in the floor, so 3 holes located & loaded with 40gm cord (2 metres). Retired & fired. JC managed to break up the “step” at the bottom of 4 tonne shaft so will try to clear this on Monday. Adrian.