Monday 8th October 2018
James Collings, John Cooper, Pete Hellier, Wayne
Starsmore and Adrian Vanderplank. Early start saw us taking 1 bag of sand in
then hauling spoil up the bottom shaft. With Adrian filling, Wayne hauling,
Pete transferring and John stacking 20 loads were hauled up before James
arrived. Then we all moved down one position so that Adrian could have a good
look at the bottom and another 27 loads were hauled up to leave the bottom
clear except for a couple of rocks Adrian wants for walling. 2 hours.