Monday 5th November 2018
John Cooper, Pete Hellier, Will Reed and Barry
Weaver. With Pete filling, Barry on the ledge, John hauling and Will in The
Pitt 42 good loads were hauled up Four-Tonne shaft to The Pitt. Pete had to be
asked a couple of times to put a bit less in the tub. The Pitt was then
emptied, initially we hauled to the very top but when spoil threatened to roll
back into The Pit we changed to the main passage. There is still a bit left at
the bottom of Four-Tonne shaft - not enough for a full session. 2¾ hours.