Monday 14th August 2017
John Cooper and Barry Weaver. Replaced the
deviation pulley in Four Tonne Shaft then cleared the Pit. 1½ hours.
Monday 7th August 2017
John Cooper, Simon Richards (Nik Nak) and Barry
Weaver. Removed the anchor at the main haul in Four Tonne Shaft and replaced
with a 10mm stainless anchor supplied by Tony Seddon (John’s Bosch drill taken
in and used to drill new hole). Then hauled 42 loads up the shaft, leaving the
rock in the Pit and the gravel in the tunnel. Finally removed the deviation
pulley in Four Tonne Shaft to measure and send details to Nigel Graham. 2½
hours.
Monday 31st July 2017
John Cooper, Simon Richards (Nik Nak) and Barry
Weaver. Nik Nak brought along a rocket tube of cement. We did 3 mixes of
mortar, 2 for the lower part of the upper wall and 1 for the lower wall. There
is no cement and only 1 bag of sand left in the cave. Checked the new pulley
wheel that Nigel has made but it is completely the wrong size. 1½ hours.