Monday 7th August 2017

John Cooper, Simon Richards (Nik Nak) and Barry Weaver. Removed the anchor at the main haul in Four Tonne Shaft and replaced with a 10mm stainless anchor supplied by Tony Seddon (John’s Bosch drill taken in and used to drill new hole). Then hauled 42 loads up the shaft, leaving the rock in the Pit and the gravel in the tunnel. Finally removed the deviation pulley in Four Tonne Shaft to measure and send details to Nigel Graham. 2½ hours.