Wednesday 25th July 2018
John Cooper. Completed drilling 20mm holes.
Drilled 1 in the wrong place so will need to fill it. Also 1 in a sub-optimal
band of rock. 2¼ hours.
Tuesday 24th July 2018
John Cooper. Started work on converting Hazel
Pitch into a via ferrata. Drilled marker holes, 5.5mm at suitable locations and
spacing. Then drilled 20mm holes stating at the bottom. Allowed for an overlap
with a sideways move about halfway up. Still more drilling required. 4 hours.
Monday 23rd July 2018
John Cooper, Simon Richards (Nik Nak), Wayne
Starsmore, Adrian Vanderplank, Jude Vanderplank and Barry Weaver. Working the
bottom shaft tonight. Barry hauling at the top of the bottom shaft, Jude
transferring and Wayne stacking at the bottom of Four-Tonne shaft. Initially
John went down and broke up the existing boulders with the hammer with Nik-Nak
loading and Adrian hauling part way down the bottom shaft. John and Adrian then
swapped places and Adrian continued capping the way on. To finish they brought
down the end wall! A total of 43 loads hauled up the bottom shaft. 2½+ hours.