Survey

Survey
Spider Hole November 2021

Tuesday 24th July 2018

John Cooper. Started work on converting Hazel Pitch into a via ferrata. Drilled marker holes, 5.5mm at suitable locations and spacing. Then drilled 20mm holes stating at the bottom. Allowed for an overlap with a sideways move about halfway up. Still more drilling required. 4 hours.