Survey

Survey
Spider Hole November 2021

Thursday 26th July 2018

am. John Cooper. Installed 10 steps before running out of epoxy resin. 2 hours

pm. Installed last 8 steps. The wall needs the rock dust washing off it as it makes it slippery and looks messy. Need to consider whether a rope for cows-tails needed attaching to steps. The ladder was removed and on examination found to have corrosion in 2 places, both at the bottom where it was resting on the floor. 1¼ hours.