Monday 23rd April 2018
John Cooper, Will Reed and Simon Richards (Nik
Nak). With John at the bottom filling buckets 42 loads of boulders were sent up
to Nik Nak at the top who threw them along the top tunnel where they still
reside - need moving to bottom of Four-Tonne Shaft. A similar quantity of
gravel and smaller rocks were sent up to Will who emptied the small buckets
behind the bottom retaining wall - this is now full and needs building higher.
A good draught was coming along the curvy crack. Nik Nak reckons dig more floor
out then follow the lower curvy crack. Still a bit of debris to move but not a
lot. A good 2½ hour session.