Spider Hole Dig
Survey
Spider Hole November 2021
Thursday 11th July 2019
John Cooper, Adrian Vanderplank and Jude Vanderplank. 1 mix of cement taken to the bottom. Half used by Adrian in the bottom tunnel and the other half by John in the bottom shaft. Rough survey of the Grotto done. 2¼ hours.
Newer Post
Older Post
Home