Survey

Survey
Spider Hole November 2021

Thursday 11th July 2019


John Cooper, Adrian Vanderplank and Jude Vanderplank. 1 mix of cement taken to the bottom. Half used by Adrian in the bottom tunnel and the other half by John in the bottom shaft. Rough survey of the Grotto done. 2¼ hours.