Monday 30th May 2016

James Collings, John Cooper, Adrian Vanderplank and Jude Vanderplank. Moved some of the spoil from the bottom to the bottom of Four-Tonne Shaft. Still another session required but need to make some stacking space first. No fumes. 1¾ hours. John.

James, John, Jude & Myself. All down to the bottom of Four Ton shaft. With John C going to the bottom to clear the debris from 27/5’s bang. We managed to clear the majority of that spoil and we only had to stop due to limited space at the bottom of 4 ton shaft. Several clearing sessions will be required before we can dig at the bottom again. Adrian.