Monday 10th December 2018
John Cooper, Mike Kousiounis, Tony Seddon and
Wayne Starsmore. Took in 3 bags of sand. With Tony loading, Wayne hauling, John
transferring and Mike stacking 23 loads were hauled up the bottom shaft to
leave it clear. John went down then and moved 2 large rocks from the tunnel and
broke them up. Very drippy still. 1½ hours.