Monday 17th December 2018
John Cooper, Mike Kousiounis, Will Reed, Wayne
Starsmore and Adrian Vanderplank. Took in a bag of sand. One mix of cement
taken to the bottom by Adrian and used to continue walling up the left hand
side. Meanwhile with John loading, Wayne on the ledge, Will hauling and Mike in
The Pit we cleared the bottom of Four-Tonne Shaft to The Pit. We then moved on
up and cleared The Pit depositing the spoil at the bottom of the ladder. Deemed
to be 42 loads (nobody counted!). 2½ hours.