Monday 3rd December 2018

John Cooper, Mike Kousiounis and Wayne Starsmore. Cleared The Pit, 51 loads, then Mike and Wayne took the long bar to the bottom. They created spoil from the floor but the roof would not come down. Whilst they were away John did two mixes of cement and built more wall at the bottom of Nut Pitch. Whole place very drippy tonight but no draught. 2½ hours.