Survey

Survey
Spider Hole November 2021

Monday 15th April 2019

John Cooper, Tony Seddon, Will Reed, Adrian Vanderplank and Jude Vanderplank. First task was to install a new ladder on the top part of Nut pitch. It is 4mm wire, built in spreader of 400mm, 7.2m total length with 28 rungs. The old one removed last week was not in a fit state for re-use. Then the karabiner used as a pulley at the top of the main drop on Four-Tonne shaft was replaced as the old one was rather worn! Thanks to Tony for this. Then with Adrian loading, John on the ledge, Will and Tony hauling and Jude in The Pit 50 loads were hauled up Four-Tonne shaft and dumped in The Pit for future upwards movement. Adrian reckons at least the same again left at the bottom of Four-Tonne shaft. Finally the ladders on the bottom part of Nut pitch were removed for cleaning and inspection. 2¼ hours.