Survey

Survey
Spider Hole November 2021

Sunday 31st March 2019


John Cooper, Adrian Vanderplank and Jude Vanderplank.
Went to reduce the boulder at the face to manageable chunks. 4 x 10mm holes x 550mm long drilled for 40gm cord. Wire did not quite reach bottom of Four-Tonne shaft. Spoil now waiting collection. 2¼ hours.