Monday 24th June 2019


John Cooper, Mark Easterling (Bean), Mike Kousiounis, Will Reed, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. Took in 2 bags of sand. First we cleared Four-Tonne Shaft, 14 loads. John loading, Bean on the ledge, Wayne hauling, Jude in The Pit, Adrian and Mike doing top haul and transfer to the Spiral Staircase (Will arriving as this bit was finishing). We then moved down and started filling up the bottom of Four-Tonne again! John lowering the floor of the bottom tunnel, Bean hauling the loads back to the base of the bottom shaft where Adrian transferred it for Mike and Will to haul up to pass to Jude to stack at the bottom of Four-Tonne shaft. Meanwhile Wayne broke up lots of the rocks that had been left at the base of the bottom shaft. About 40 loads hauled up the bottom shaft. 2¼ hours.